Shift A · 06:00–14:00Simulated dataStart demo

Green tyre count

Shift A so far, 06:00 to 10:42. Every number comes from the machines and the press scanners, not from anyone typing it in.

Shift A · 11 Nov 2026
Built (verified)319Machine and sensor agreed
Received at press304Scanned at press loading
Waiting on carts13Within 20 minutes of build
Missing2Counted, never reached a pressFlagged attempts3Stopped, not counted

319 built = 304 loaded + 13 waiting + 2 missing. Every counted tyre is accounted for.

By builder

All builders
BuilderMachineBuiltReceivedOn cartMissing
N. PereraBadge 1042BM-01605730
S. FernandoBadge 1187BM-02575430
R. SilvaBadge 1093BM-0354503−1
A. BandaraBadge 1215BM-04555230
M. JayasingheBadge 1068BM-0549471−1
D. WickramasingheBadge 1130BM-06444400

Built vs received per hour

BuiltReceived at pressThe 10:00 hour is still running.

Missing serials (2)

Open shift report
Building hallBM-0160185/65 R15BM-0257185/65 R15BM-0354195/55 R16BM-0455195/55 R16BM-0549205/60 R16BM-0644Stopped · size changeCartsCart A6waitingCart B6waitingCart C1waitingCuring hallP-0127 loadedP-0228 loadedP-0328 loadedP-0428 loadedP-0528 loadedP-0628 loadedP-0727 loadedP-0828 loadedP-0928 loadedP-1027 loadedP-1127 loadedP-12idle
RunningFlagged in the last 15 minIdle

Latest activity

  1. GT-2611-0319 built on BM-03, counted and labelled.
  2. GT-2611-0318 built on BM-02, counted and labelled.
  3. GT-2611-0307 scanned into P-08. Matches its build on BM-01.
  4. GT-2611-0305 scanned into P-07. Matches its build on BM-02.
  5. GT-2611-0317 built on BM-04, counted and labelled.
  6. GT-2611-0316 built on BM-01, counted and labelled.