Shift A · 06:00–14:00Simulated dataStart demo

How the count works

Follow one green tyre from the building machine to the press, one click at a time. Then try to cheat the count and see how each attempt is caught.

BM-01 · no one signed inCount 0BM-02Idle in this demoGreen tyre cart0 waitingP-02 · 0 loadedWaiting
0Built and counted
0Loaded into presses
0Not yet loaded
0Missing
0Attempts flagged

Shift record

Events appear here as you step through the demo.

Missing tyres

None. Every counted tyre has been loaded or is still within its 20 minutes.

How it is installed

  • The machine's cycle signal is read only. Nothing changes machine settings.
  • A sensor or camera at the unload point confirms each tyre.
  • Labels print at the machine. Scanners sit at press loading.
  • Runs alongside the current count until the plant approves the switch.